Projects
Tour Solstice Montreal [SLIDER 01]
Solstice Tower Montreal
44
floors in total
Tour Solstice Montreal [SLIDER 02]
Solstice Tower Montreal
147,5 m
high
Tour Solstice Montreal [SLIDER 03]
Solstice Tower Montreal
330
housing units
Tour Solstice Montreal [SLIDER 04]
Solstice Tower Montreal
5-level
underground parking lot
Tour Solstice Montreal [SLIDER 05]
Solstice Tower Montreal
A
5,000 sq. ft.
commercial space
Tour Solstice Montreal [SLIDER 06]
Solstice Tower Montreal
A total area of
300,000 sq. ft.
Tour Solstice Montreal [MOBILE 01]
Solstice Tower Montreal
44
floors in total
Tour Solstice Montreal [MOBILE 02]
Solstice Tower Montreal
147,5 m
high
Tour Solstice Montreal [MOBILE 03]
Solstice Tower Montreal
330
housing units
Tour Solstice Montreal [MOBILE 04]
Solstice Tower Montreal
5-level
underground parking lot
Tour Solstice Montreal [MOBILE 05]
Solstice Tower Montreal
A
5,000 sq. ft.
commercial space
Tour Solstice Montreal [MOBILE 06]
Solstice Tower Montreal
A total area of
300,000 sq. ft.

Summary

Name : Solstice Tower Montreal
Address : 1020 Rue de la Montagne, Montreal
Project type : Residential towers - Offices, Industrial & Commercial
Mandate : Development and project management
Timeline : 2019-2021
Size of construction site : 200,000 sq. ft.
Client’s name : QMD-Ménard Consortium
Architect : NEUF Architectes 
Project website : www.solsticemontreal.com

Challenges

  • Building a 44-storey tower in downtown Montreal, beside the Bell Centre
  • Working on a project in the heart of downtown Montreal
  • Limiting noise and avoiding disturbing residents in the neighbourhood
Tour Solstice Montreal [01]
Tour Solstice Montreal [02]
Tour Solstice Montreal [03]
Tour Solstice Montreal [04]

Solstice Tower Montreal

This tower is the latest in a series of downtown skyscrapers beside the Bell Centre that include the Tours des Canadiens buildings, L’Avenue and Roccabella. The Solstice Tower will contain 330 luxurious condos of various sizes from studios and one, two and three-bedroom units to penthouses. The condos will offer a breathtaking view of Montreal. Six corner apartments instead of four create optimized, light-filled and airy spaces.

The fixtures in both the apartments and shared areas will be designed with care to include elegant and inviting materials like oak, Montreal greystone and copper. The Solstice Tower will also offer residents a range of exceptional amenities: a five-level underground parking lot, a business centre for meetings, an aquatic area inspired by Nordic spas, gyms and yoga studios, an owners’ lounge, a private cellar, and an exclusive tasting room.

A 5,000-square-foot commercial space on the ground floor will link to a walkway. This pedestrian walkway, flanked by dramatic columns, will link Avenue des Canadiens and Overdale Street, which is a stone’s throw from Lucien-L’Allier metro station.

This project will present one major challenge for QMD: the complex works will be carried out in a busy, densely-populated area so noise must be limited so as not to disturb business owners and residents in the neighbourhood. This will be particularly challenging because of the presence of another nearby construction site.