Cegep Garneau - Renovation of
Physical Activity Centre

Project completed in a busy environment on schedule.
Completed
2017
2018
Client
Cégep Garneau
Année
2018
Secteur
Institutional buildings
Catégorie
Rehabilitation
Mandat
Fixed Price Project
Emplacement
Quebec City, QC
Taille
43,670 sq. ft.
Architectes

CCM2

L’histoire du projet
Complete redesign and upgrade of the electromechanical equipment.
QMD was mandated to renovate the interior and exterior of the Cégep Garneau's physical activity center in Quebec City. The work included the complete renovation of the exterior, insulation, doors and windows, and patching and painting of the training rooms, which were built in 1999.

The project included roof reconstruction and related work, the replacement of all mechanical ventilation and air-conditioning systems, electrical equipment and lighting, and the addition of a large mechanical room and a drying unit for the pool area.  Computer, multimedia and sound systems for the student areas completed our mandate.

Challenges
  • Work was carried out close to occupied premises without interfering with Cégep activities.
  • Work was carried out on a tight schedule; severe penalties were imposed for exceeding the schedule.
  • Project location: Proximity to a residential area with respect to authorized hours for noisy work